Neihu Line (內湖線) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
A Bombardier CITYFLO 650 train on the Neihu Line |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Overview | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Type | Rapid transit | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Taipei, Republic of China | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Termini | Songshan Airport Taipei Nangang Exhibition Center |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Stations | 12 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operation | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | July 4, 2009 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator(s) | Taipei Rapid Transit System | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Character | Elevated and underground | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Depot(s) | Neihu Depot | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Rolling stock | Bombardier CITYFLO 650 2 cars per set, 2 sets per train |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length | 14.8 km (9.2 mi) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
No. of tracks | 2 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 1,880 mm (6 ft 2 in)[1] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electrification | Third rail (750 volts DC) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operating speed | 80 kilometres per hour (50 mph) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Neihu Line (Taipei Metro) | |||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Traditional Chinese | 內湖線 | ||||||||||||||||
|
The Taipei Metro Neihu Line is a medium-capacity rapid transit system and runs on an elevated corridor except near Songshan Airport and Dazhi. The line's service length is 14.8 kilometres (9.2 mi) and it is joined to the Wenshan Line at Zhongshan Junior High School Station, providing direct service through Neihu, Nangang, and Wenshan.
Contents |
The Neihu Line is a Phase 1 Brown Line extension that brought rapid transit into the Neihu District (the last of Taipei's districts to have rapid transit).[2] The line has 12 stations: 10 elevated and 2 underground stations. Construction was completed in late 2008, and trial operations began in early 2009. The line officially began service on July 4, 2009.[3][4]
The long-awaited Neihu Line has had many delays prior to its opening. Since the Neihu Line was planned as an extension to the Wenshan Line, the original plan called for a similar elevated medium-capacity line. However, due to the growth of the Neihu District, many residents and politicians called for an underground, high-capacity line instead (similar to the Blue Line (TRTS)).[5]
The initial cost estimate of the elevated line was NT$42.6 billion, but due to delays the price-adjusted cost estimate rose to over NT$60.3 billion. A shift to underground construction would have increased the cost to as high as NT$134.4 billion. However, the Central Government stated that if construction for the Neihu Line did not start immediately, they would withhold the grant money for the line. In addition, due to the narrow streets and numerous turns in Neihu, construction of an underground high-capacity line would have been infeasible.[6] Thus, the plan to build an elevated line continued after much delay.[5]
There was also significant debate whether Songshan Airport should be included on the route.[6] The addition of the station added an additional 1.9 kilometres (1.2 mi) to the line's length. Because of the inclusion of the station, the final cost of the line reached NT$66.7 billion.[7]
The line was initially planned to begin service in 1996, and after 13 years of delay, the line finally began operations. However, the Neihu Line has been criticized for its frequent malfunctions and safety issues.[6]
When the line began service in July 2009, the line only used the new Bombardier CITYFLO 650 train sets, with the old VAL 256's to be modified to work with the new Bombardier system.
On December 19, 2010, fifty-one pairs of retrofitted VAL 256's (from the Matra rolling stock) will begin testing on the entire line.[11] After over half a year of testing, the additional trains will decrease the time between trains at rush hour from 2 minutes to 72 seconds and bring the total number of trains operating on the line to 152 pairs.[11] The trains are expected to fully enter revenue service after testing by December 26, 2010.[10][12] On December 26, 2010, the line will operate with 6 pairs of the retrofitted VAL 256's and 25-29 pairs of the CITYFLO 650's. By December 27, the ratio is expected to increase, with 10 pairs of VAL 256's and 40 pairs of the CITYFLO 650's.[12]
Code | Station Name | Transfer | Location | ||
---|---|---|---|---|---|
English | Chinese | ||||
Neihu Line | |||||
B11 | Taipei Nangang Exhibition Center | 南港展覽館 | ■ Nangang Line | Nangang | Taipei |
B10 | Nangang Software Park | 南港軟體園區 | |||
B9 | Donghu | 東湖 | Neihu | ||
B8 | Huzhou | 葫洲 | |||
B7 | Dahu Park | 大湖公園 | |||
B6 | Neihu | 內湖 | |||
B5 | Wende (Bihu Park) |
文德 (碧湖公園) |
|||
B4 | Gangqian | 港墘 | |||
B3 | Xihu (Takming Univ.) |
西湖 (德明科大) |
|||
B2 | Jiannan Road (Miramar) |
劍南路 (美麗華) |
■ Circular Line (2015) | Zhongshan | |
B1 | Dazhi (Shih Chien University) |
大直 (實踐大學) |
|||
BR1 | Songshan Airport | 松山機場 | Songshan | ||
BR2 | Zhongshan Junior High School | 中山國中 | Zhongshan Songshan |
||
→ Continues through to the ■Wenshan Line |
The depot is located in the northeastern section of Nankang Software Park. The facility is 600 meters long, 120 meters wide, and covers and area of 7.21 hectares. Upon completion of its maintenance facilities, the Neihu Depot will take over as the major maintenance center from the existing Wenshan Depot.[13]
|